Peanut roaster machine

1. After the user receiving the peanut roasing machine before commissioning, he should check the insulation and leave a certain distance around the device.
2. For gas heating type peanut roasting machine, there must not be gas leakage around the joints and valves of peanut roaster when operating. To ensure the safety of personnel, balloons are not allowed near the heating source, and dangerous goods are not allowed to be stored around it to avoid danger. Turning off the gas supply after use.
3, Electric heating power can take three-phase power (380V) and single-phase power (220V), and it must be connected to the leakage protection, power line outside the peanut roasting machine must be greater than 6 mm2 copper wire. Three-phase power must be connected to the zero line, otherwise it will damage the machine or electrical work. Professional electricians are needed to install the peanut roasting machine.
4, The operation of the motor clockwise reverse switch, switch in the sequence (inverted) position dial switch to stop position, had to wait more than 2 seconds, then toggle back (cis) transfer position, otherwise it will affect the service life of the motor seriously.
5, Oil the bearing every two weeks and change the lubricating oil of reducer gearbox every six months.